To: Samira (Sam) Sadeghlou & Granite Measuring Person arriving at job site 2-3 PM today

Re: Unfinished work following 12.01.10 installation of cabinets & Granite work to be done

See pictures in photo album adjacent hereto.

NOTE: Click on the Thumbnail Photo to put in the picture window.

NOTE: Double click the picture in the window to enlarge it for better viewing.

Image # and What is Shown 
1. Wide Angle view of cabinets on sink side of kitchen
2. Unfinished work alongside French Window 
3. Wide Angle view of cabinets on Range & Refrigerator side of kitchen
4. Unfinished gap near window
5. Unfinished work above alarm controls
6. Unfinished work above Range; also note that Granite must cover the entire wall space between the top of a new "slider" range and the bottom of the Microwave Oven
7. Unfinished work below cabinets adjacent to Range
8. Unfinished work above Refrigerator
9. Granite Splashguard height must cover entire area covered by the existing tile and leave no gap
10. Granite Splashguard height must cover entire area covered by the existing tile and leave no gap
11. Outdoor Granite shelf is to replace this tile shelf


Jack Muellerleile


   
   